ETH Zurich 2006

From 2006.igem.org

(Difference between revisions)
Jump to: navigation, search
(Schedule: added deadline for project documentation on the wiki)
(structured this page into a "Coordination" part and a "Report and documentation" part)
Line 1: Line 1:
[[Image:ETH-logo-small.gif|ETH Zurich]]
[[Image:ETH-logo-small.gif|ETH Zurich]]
-
== TODOs ==
+
== Coordination ==
-
=== Modeling ===
+
=== TODOs ===
 +
 
 +
==== Modeling ====
*'''Parts''' Model the whole System with Sensing, Pop's duplexer and Half adder (Marco and Franz)
*'''Parts''' Model the whole System with Sensing, Pop's duplexer and Half adder (Marco and Franz)
Line 9: Line 11:
*Finish modeling the second AND Gate and find a biological way to implement it and write the DNA and order it (Marco and Robert)
*Finish modeling the second AND Gate and find a biological way to implement it and write the DNA and order it (Marco and Robert)
-
=== Lab ===
+
==== Lab ====
Responsible: Robert for the preparatory experiments, Olga for the assembly and testing of the gates.
Responsible: Robert for the preparatory experiments, Olga for the assembly and testing of the gates.
Line 18: Line 20:
*Assembly of the chemical sensing device (Franz, Dimo, Robert, Marco, Marko, Olga)
*Assembly of the chemical sensing device (Franz, Dimo, Robert, Marco, Marko, Olga)
-
=== Documentation ===
+
==== Documentation ====
Responsible: Alexandra for the registry, Franz for the presentation, Arthur for the Wiki.
Responsible: Alexandra for the registry, Franz for the presentation, Arthur for the Wiki.
Line 28: Line 30:
*Find promoters for the Pops duplexer (2 promoters in total) (Michael)
*Find promoters for the Pops duplexer (2 promoters in total) (Michael)
-
== Schedule ==
+
=== Schedule ===
Available as Google Calendar: [http://www.google.com/calendar/render?cid=pqi8ni6gnfj5r3o0np0h4smrr4@group.calendar.google.com iGEM 2006 ETH Zurich]
Available as Google Calendar: [http://www.google.com/calendar/render?cid=pqi8ni6gnfj5r3o0np0h4smrr4@group.calendar.google.com iGEM 2006 ETH Zurich]
Line 42: Line 44:
;4./5.11.:Jamboree in Boston
;4./5.11.:Jamboree in Boston
-
== Participants ==
+
=== Participants ===
<center>[[Image:ETH_2006_pic_for_frontpage.jpg|ETH Team 2006]]
<center>[[Image:ETH_2006_pic_for_frontpage.jpg|ETH Team 2006]]
Line 58: Line 60:
* [[Marko Jovanovic]]
* [[Marko Jovanovic]]
-
== First Group Phase (July 20th - August 3rd) ==
 
-
We split up the whole group into two teams to come up with a more detailed "vision" for our two designs:
 
-
<pre>
 
-
Group 1        Group 2
 
-
Michael        Franz
 
-
Dimo          Alexandra
 
-
Olga          Robert
 
-
Arthur        Marco
 
-
Marko
 
-
</pre>
 
-
[[ETH 2006 Meat Monitor|group 1]]
 
-
[[ETH 2006 Half adder|group 2]]
+
== Progress report and documentation ==
 +
 
 +
=== [[ETH 2006 Ideas|Initial project ideas]] ===
 +
 
 +
[[ETH 2006 Ideas|The fruits of some brainstorming and research]]
-
== [[ETH 2006 Ideas|Project Ideas]] ==
+
=== First Group Phase (July 20th - August 3rd) ===
-
During the first group phase, we mainly focus on two designs
+
We split up the whole team into two groups, each proposed a project after these two weeks.
-
* the [[ETH 2006 Meat Monitor|Meat Monitor]] (group 1) and
+
-
* the [[ETH 2006 Half adder|Half-adder]] including an application to pattern recognition (group 2).
+
-
Before, we had various different ideas, which can be found [[ETH 2006 Ideas|here]].
+
-
== Press ==
+
* [[ETH 2006 Meat Monitor|Meat monitor project]] (Michael, Dimo, Olga, Arthur, Marko)
-
The German magazine Spiegel wrote about the iGEM competition on August 14, 2006. The article (in German) can be found [http://www.spiegel.de/spiegel/0,1518,431399,00.html here].
+
* [[ETH 2006 Half adder|Half adder/pattern recognition project]] (Franz, Alexandra, Robert, Marco)
-
== [[ETH_2006_Docs_And_Links|Useful Documents & Links]] ==
+
=== [[ETH_2006_Docs_And_Links|Useful Documents & Links]] ===
[[ETH_2006_Docs_And_Links|see here]]
[[ETH_2006_Docs_And_Links|see here]]

Revision as of 19:04, 5 October 2006

ETH Zurich

Contents

Coordination

TODOs

Modeling

  • Parts Model the whole System with Sensing, Pop's duplexer and Half adder (Marco and Franz)
  • Model whether a different strength of input is necessary for the AND and XOR Gates (Who?)
  • Finish modeling the second AND Gate and find a biological way to implement it and write the DNA and order it (Marco and Robert)

Lab

Responsible: Robert for the preparatory experiments, Olga for the assembly and testing of the gates.

  • Read the literature on the XOR and AND Gates, check carefully for strains needed and compatibility of the parts (Who?)
  • Prepare a protocol for parts assembly (Olga)
  • Assembly of the light sensing device from the parts we received from UCSF Voigt's lab (Arthur)
  • Assembly of the chemical sensing device (Franz, Dimo, Robert, Marco, Marko, Olga)

Documentation

Responsible: Alexandra for the registry, Franz for the presentation, Arthur for the Wiki.

  • enter lab experience report to registry
  • restructure the Wiki, identify lacking information and find people who can provide it (Arthur)
  • Make a picture of the whole model with te different parts in it (Alexandra)
  • Make a drawing of the DNA to have an overview of which parts will be consecutively on the same DNA piece (Alexandra)
  • Find promoters for the Pops duplexer (2 promoters in total) (Michael)

Schedule

Available as Google Calendar: iGEM 2006 ETH Zurich

Thu 20.7., 1700: kickoff meeting in CNB E 121
27.7.-3.8. 1st group phase
Define project in more detail within two groups
Thu 27.7., 1700: meeting of entire group to share ideas
Thu 3.8., 1700: decision on final project
15.8. 1700
Tutorial "Modelling of AND gate"
Until 20.8.
Finalize DNA design, order it
September,October
Implement design (registry bio-bricks, ordered DNA)
27.9.
Fix the flight dates and send the proposed flights to Jörg
23.10.
Latest point to start getting our presentation going and to finish the iGEM wiki documentation
30.10.
Project documentation on the Wiki has to be complete
4./5.11.
Jamboree in Boston

Participants

ETH Team 2006


Marco, Alexandra, Arthur, Olga, Dimo, Marko, Robert,


Franz, Michael


Progress report and documentation

Initial project ideas

The fruits of some brainstorming and research

First Group Phase (July 20th - August 3rd)

We split up the whole team into two groups, each proposed a project after these two weeks.

Useful Documents & Links

see here

Personal tools
Past/present/future years