+ | [http://2006.igem.org/University_of_Edinburgh_2006 Main page] | ||
+ | |||
+ | ==<font color='red'>Week 9: 14<sup>th</sup> - 18<sup>th</sup> August</font>== | ||
+ | |||
+ | ==Meeting - 15<sup>th</sup> August''== | ||
+ | |||
+ | '''Wiki''' | ||
+ | |||
+ | * Still need to fix the primers! | ||
+ | |||
+ | |||
+ | '''Cambridge visit''' | ||
+ | |||
+ | * Cambridge are coming from the 22<sup>nd</sup> to 24<sup>th</sup> August | ||
+ | * Meal and drinks on Tuesday 22nd August followed by a ghost tour or a show | ||
+ | * ICL aren’t coming | ||
+ | |||
+ | |||
+ | '''Presentation''' | ||
+ | |||
+ | * Need to make up a presentation – what’s been achieved since Cambridge visit | ||
+ | * Make it about half an hour long | ||
+ | |||
+ | * Characterisation experiments – Kim & Jen | ||
+ | * Lab (AM) – Farid & Jude | ||
+ | * Model – Patrick & Bryony | ||
+ | |||
+ | * Send slides to Jen on Friday 18th August | ||
+ | |||
+ | |||
+ | '''pH Turtle''' | ||
+ | |||
+ | * Bryony will try & get a laptop as Chris’ other one didn’t work | ||
+ | |||
+ | |||
+ | '''Modelling''' | ||
+ | |||
+ | * Worked up from a molecular to a concentration basis | ||
+ | * Want to correlate LacZ output with pH measured – need to add on reactions | ||
+ | * Is it possible to model other components present in the media e.g. amino acids? | ||
+ | * Have joined all three operons in the model | ||
+ | * Have some results - see discussion board | ||
+ | * pH shown to get very high when urease is switched on | ||
+ | * Going to do parameter sensitivity analysis | ||
+ | * Chris asked if it is possible to check model with any papers... | ||
+ | |||
+ | |||
+ | '''Biobricks''' | ||
+ | |||
+ | * ArsR with LacZ tests have been carried out | ||
+ | * Arsenic doesn’t affect pH response – maybe LacZ is constantly on/problem with arsenic promoter? | ||
+ | * Need to sequence – first must get preparation protocol from Jen or Chris | ||
+ | * Plan was to combine LacZ and Lambda CI with arsenic promoter but not much point until we have a working arsenic promoter. Apparently the one we have used so far gives a very weak signal. | ||
+ | |||
+ | * Chris has bacillus arsenic promoter bio-bricked. Farid is putting it into our e-coli. | ||
+ | |||
+ | * Have urease to use with calcium phosphate. Is it biobricked? | ||
+ | * Sree is going to design experiments and carry these out, probably in September | ||
+ | |||
+ | |||
+ | '''Practical construction of working device''' | ||
+ | |||
+ | * Make up 0.1M KCl buffer solution | ||
+ | * Make up Buffer Z for ONTG LacZ assay | ||
+ | |||
+ | * Come up with solid concept for device and then email Andrew Meharg (author of Venomous Earth) to ask his advice | ||
+ | |||
+ | |||
+ | '''Website''' | ||
+ | |||
+ | * Add other photos to gallery | ||
+ | * Put up some significant results | ||
+ | * Need to design Macteria mascot – have attempted this but it's awful! | ||
+ | |||
+ | |||
+ | '''Visas''' | ||
+ | |||
+ | * Sree, Patrick and Farid must get visas to go to USA. Involves making an appointment at the US embassy in either Belfast or London, getting a 9 day business visa which only allows visit to MIT and costs about £100. | ||
+ | |||
+ | * Need to check requirements for UK citizen entry to USA. | ||
+ | |||
+ | * Bryony might not be coming to MIT, depends on her PHD work. | ||
+ | |||
+ | |||
+ | '''Miscellaneous''' | ||
+ | |||
+ | * Bryony is aiming to finish by the end of this week | ||
+ | * Sree can work September and October | ||
+ | * Kim can work October | ||
+ | |||
+ | |||
+ | |||
+ | ==<font color='red'>Week 7: 31<sup>st</sup> July - 4<sup>th</sup> August</font>== | ||
+ | |||
+ | ==Meeting - 2<sup>nd</sup> August''== | ||
+ | |||
+ | |||
+ | '''Wiki''' | ||
+ | |||
+ | * Update Wiki re. primers for biobricks | ||
+ | |||
+ | |||
+ | '''Tamara’s visit''' | ||
+ | |||
+ | * Team meeting at 10am in Hons room on Tuesday 8th August | ||
+ | * Construct an agenda for meeting | ||
+ | * Show her round the labs | ||
+ | * Attend a Fringe Festival show in the evening | ||
+ | |||
+ | |||
+ | '''Cambridge visit''' | ||
+ | |||
+ | * Best dates are 22<sup>nd</sup> to 24<sup>th</sup> August | ||
+ | * Failing this, the start of September is okay | ||
+ | * Jude currently has 3 spare rooms (possibly 4) from 22nd to 24th August | ||
+ | * Invite ICL as well | ||
+ | |||
+ | |||
+ | '''Holidays''' | ||
+ | |||
+ | * Jude: 8<sup>th</sup> – 16<sup>th</sup> August | ||
+ | * Laszlo: 8<sup>th</sup> – 22<sup>nd</sup> August | ||
+ | * Sree: 24<sup>th</sup> – 25<sup>th</sup> August | ||
+ | * Jelena: 27<sup>th</sup> August – 9<sup>th</sup> September | ||
+ | * Kim: 8<sup>th</sup> – 28<sup>th</sup> September | ||
+ | * Farid: ??? September | ||
+ | * Bryony: ??? September | ||
+ | |||
+ | |||
+ | '''pH Turtle''' | ||
+ | |||
+ | * Currently not working. Chris suggests deleting mouse software from laptop. Will try this. | ||
+ | |||
+ | |||
+ | '''Modelling''' | ||
+ | |||
+ | * Meeting on Friday 4th August with Hong Wu | ||
+ | |||
+ | |||
+ | '''Practical construction of working device''' | ||
+ | |||
+ | * Kim has come up with lots of characterization experiments to be done in the lab next week once we have the arsenic-sensing device | ||
+ | |||
+ | * Device might be ready on Friday 4th August | ||
+ | |||
+ | * Email Andrew Meharg (author of Venomous Earth) to ask his advice on arsenic biosensing device | ||
+ | |||
+ | |||
+ | '''Website''' | ||
+ | |||
+ | * Do we need a disclaimer? | ||
+ | |||
+ | * Need to design Macteria mascot – possibly ask the guy who did the cartoon for Drew and Endy (Nature website)! | ||
+ | |||
+ | |||
+ | '''Biobricks''' | ||
+ | |||
+ | * These can be added to the registry when they are ready (well done Jude who has done this before the minutes have been typed!) | ||
+ | |||
+ | |||
+ | |||
==<font color='red'>Week 5: 17<sup>th</sup> - 21<sup>st</sup> July</font>== | ==<font color='red'>Week 5: 17<sup>th</sup> - 21<sup>st</sup> July</font>== | ||
==Meeting - 18<sup>th</sup> July''== | ==Meeting - 18<sup>th</sup> July''== | ||
+ | |||
'''Labwork on Arsenic Biosensor:''' | '''Labwork on Arsenic Biosensor:''' | ||
Line 64: | Line 226: | ||
* Design a badge if you have a spare five minutes | * Design a badge if you have a spare five minutes | ||
* Presentation completed | * Presentation completed | ||
+ | |||
+ | |||
+ | [http://2006.igem.org/University_of_Edinburgh_2006 Main page] | ||
+ | __NOTOC__ |
Latest revision as of 09:34, 25 October 2006
[http://2006.igem.org/University_of_Edinburgh_2006 Main page]
Week 9: 14th - 18th August
Meeting - 15th August
Wiki
- Still need to fix the primers!
Cambridge visit
- Cambridge are coming from the 22nd to 24th August
- Meal and drinks on Tuesday 22nd August followed by a ghost tour or a show
- ICL aren’t coming
Presentation
- Need to make up a presentation – what’s been achieved since Cambridge visit
- Make it about half an hour long
- Characterisation experiments – Kim & Jen
- Lab (AM) – Farid & Jude
- Model – Patrick & Bryony
- Send slides to Jen on Friday 18th August
pH Turtle
- Bryony will try & get a laptop as Chris’ other one didn’t work
Modelling
- Worked up from a molecular to a concentration basis
- Want to correlate LacZ output with pH measured – need to add on reactions
- Is it possible to model other components present in the media e.g. amino acids?
- Have joined all three operons in the model
- Have some results - see discussion board
- pH shown to get very high when urease is switched on
- Going to do parameter sensitivity analysis
- Chris asked if it is possible to check model with any papers...
Biobricks
- ArsR with LacZ tests have been carried out
- Arsenic doesn’t affect pH response – maybe LacZ is constantly on/problem with arsenic promoter?
- Need to sequence – first must get preparation protocol from Jen or Chris
- Plan was to combine LacZ and Lambda CI with arsenic promoter but not much point until we have a working arsenic promoter. Apparently the one we have used so far gives a very weak signal.
- Chris has bacillus arsenic promoter bio-bricked. Farid is putting it into our e-coli.
- Have urease to use with calcium phosphate. Is it biobricked?
- Sree is going to design experiments and carry these out, probably in September
Practical construction of working device
- Make up 0.1M KCl buffer solution
- Make up Buffer Z for ONTG LacZ assay
- Come up with solid concept for device and then email Andrew Meharg (author of Venomous Earth) to ask his advice
Website
- Add other photos to gallery
- Put up some significant results
- Need to design Macteria mascot – have attempted this but it's awful!
Visas
- Sree, Patrick and Farid must get visas to go to USA. Involves making an appointment at the US embassy in either Belfast or London, getting a 9 day business visa which only allows visit to MIT and costs about £100.
- Need to check requirements for UK citizen entry to USA.
- Bryony might not be coming to MIT, depends on her PHD work.
Miscellaneous
- Bryony is aiming to finish by the end of this week
- Sree can work September and October
- Kim can work October
Week 7: 31st July - 4th August
Meeting - 2nd August
Wiki
- Update Wiki re. primers for biobricks
Tamara’s visit
- Team meeting at 10am in Hons room on Tuesday 8th August
- Construct an agenda for meeting
- Show her round the labs
- Attend a Fringe Festival show in the evening
Cambridge visit
- Best dates are 22nd to 24th August
- Failing this, the start of September is okay
- Jude currently has 3 spare rooms (possibly 4) from 22nd to 24th August
- Invite ICL as well
Holidays
- Jude: 8th – 16th August
- Laszlo: 8th – 22nd August
- Sree: 24th – 25th August
- Jelena: 27th August – 9th September
- Kim: 8th – 28th September
- Farid: ??? September
- Bryony: ??? September
pH Turtle
- Currently not working. Chris suggests deleting mouse software from laptop. Will try this.
Modelling
- Meeting on Friday 4th August with Hong Wu
Practical construction of working device
- Kim has come up with lots of characterization experiments to be done in the lab next week once we have the arsenic-sensing device
- Device might be ready on Friday 4th August
- Email Andrew Meharg (author of Venomous Earth) to ask his advice on arsenic biosensing device
Website
- Do we need a disclaimer?
- Need to design Macteria mascot – possibly ask the guy who did the cartoon for Drew and Endy (Nature website)!
Biobricks
- These can be added to the registry when they are ready (well done Jude who has done this before the minutes have been typed!)
Week 5: 17th - 21st July
Meeting - 18th July
Labwork on Arsenic Biosensor:
Biobricks
- PCR on arsenic and LacZ parts
- 4 bands on gel from LacZ so need to find out which one is the correct one
- Create sticky ends
- Working towards arsenic device – may be ready in about 2 weeks
pH Experiments
- Want to measure population density at the point at which pH of blue and white E-Coli diverges
- Difference between stationary and growth phase response is possibly due to the fact that the bacteria ‘want’ to use up the lactose when they’re in the growth phase
- Ideal conditions for growth in LB have been established
- Want to carry out experiments using different growth media
Model
- Plenty of info on Lac operon
- Paper found regarding ArsR relation to arsenic concentration
- Autoregulation – ArsR represses itself
- Background noise may be caused due to degradation of ArsR repressor
- Might be possible to reduce this background noise by separating the promoter from the ArsR gene
- Need to calculate what pH from urea breakdown will be for different concentrations
- It is thought to be necessary to have the two-part promoter (with activator and repressor binding sites) in order to prevent a build up of alkalinity which could harm the bacteria
Wiki
- Update biobricks
Cambridge trip
- Train leaves Edinburgh Waverley at 9.30am so try to be there by about 9am
- Need to prepare a presentation (half an hour long)
- Update animation of arsenic biosensor
- Focus is arsenic project
- Mention 3D structure builder briefly
- Presentation layout
- Background – Jelena
- Building biobricks – Jude
- pH experiment/animation – Kim
- Modelling – Patrick
Idea 6/11 – 3D structure builder
- Primer design for urease
- LacI biobrick – is it ok?
To do
- Moving all experiments to Andrew Miller’s lab
- Meeting on Thursday at 2pm in Honours Room
- Website development