Thursday June 1st, MC5136B
From 2006.igem.org
(Difference between revisions)
(→WEEF/MEF proposals) |
(→Letter provided by Farshid) |
||
Line 5: | Line 5: | ||
== Funding == | == Funding == | ||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
- | |||
=== WEEF/MEF proposals === | === WEEF/MEF proposals === |
Revision as of 16:30, 5 June 2006
Attendees: Kathy Lam, Chris Herriot, Linda Chen, Jeff Wong, Anne Tran, Lance DaSilva, Sam Leung, Nancy Xu, Christina Lucey, Patrick Tsui
Agenda: Funding, Waterloo Lab space, Objectives for next week
Contents |
Funding
WEEF/MEF proposals
- Linda discussed proposal and presentation requirements.
The body of the proposal/presentation should contain: objective, timeline, resources required, background of students involved, justify the need to travel, summary and conclusion.
Key points to mention: How this project can benefit the school in the future, and the team is actively seeking funding from other sources
- Linda, Anne, Kathy, Christina, and Sam will start drafting the proposal once the budget has been drafted
Budget
- Detailed budget is crucial for funding applications
- Could not be compiled until we receive numbers for lab equipment, and travel expenses, and team size estimate (are we helping to fund the travelling expense of the UofT team? Are we putting our funds together?)
- Patrick will look into possibilities of applying for the Dean's funding with the department of Engineering
Lab Space
- if possible, the team expressed much interest in having at least part of the lab work being conducted here
- Chris will speak to Dr. Charles and other contacts within biology to look into how feasible this idea will be. Update on next week's meeting.
- Lance could potentially be our wetlab trainer
Thermometer Project
- Chris expressed possible issues with the current design and would like to seek further clarification from Stephen on the next general meeting with Uof T team.
- We would like to surface our concern as to what we can contribute to this project. Does the model need to be fine tuned? Could we help out with the lab work?
Post-Thermometer Project (or Parallel Project)
Everyone will brainstorm for ideas and bring them for discussion at the meeting next week.
Major Concerns to Resolve
- Need to take a stand on how much we would like to initiate in terms of acquiring funds
- Need to address what the UW team can contribute to the therometer project, aside from fund raising.