Construction

From 2006.igem.org

Revision as of 05:32, 19 October 2006 by Chuck (Talk | contribs)
Jump to: navigation, search

< Aug11-Sep7 | Sep8-14 | Sep15-26 | Sep27-Oct3 | Oct4-Oct13 | Construction >

October 18, 2006

Andy, Konstantin:

  • Transformed and plated Q03400 (2005) (2006)
  • Gel-extracted UT1 DEF with EcoRI/SpeI (2500-3000, 5000, 8000), 8000 band bright, digestion appeared incomplete
  • Made A, K, AK plates
  • Made o/n of Q04400 (2005) (2006) Q04510 (2005) (2006)
  • Tested UT3 in DH5a with 0%-2% arabinose

To-Do List:

  • Make o/n of Q03400 (2005) (2006)
  • Miniprep Q04400 (2005) (2006) and Q04510 (2005) (2006)
  • Replate UT1 with miniprep from a good conlony
  • Miniprep Q04400 (2005) (2006) Q04510 (2005) (2006) and check to see if bands are correct. If so, digest with EcoRI/XbaI and gel extract
  • Ligate with UT1

[http://2006.igem.org/University_of_Toronto_2006 Home]

October 14, 2006

Charles, Jovan:

  • Mini-prepped UT2 2/4 and UT3 7
  • Transform UT2 2/4 and UT3 7 into DH5a-z1 and DH5a cells
  • Continue with the IPTG test for the rest of the colonies that we weren’t able to test yesterday

To-Do List:

  • Measure absorbance spectrum of Arabinose
  • Make o/n of working UT2/UT3 for repeat of IPTG test.
  • Look into using tetR and tet pL instead of cI and Prm+

[http://2006.igem.org/University_of_Toronto_2006 Home]

Personal tools
Past/present/future years