Second Meeting, Thursday, July 13, 2006

From 2006.igem.org

Revision as of 15:38, 17 July 2006 by Herak (Talk | contribs)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

The Second Critical Design Review meeting took place today at 4pm at the CCBR cafe. Later it got relocated to the SF computer labs.

Overview

The participants spent most of the time brainstorming, to come up with a way to test the existing design. They also tried to put together a flexible timeline to carry out this testing. The team members will be working on these topics on their own during the upcoming days before they meet for the 3rd meeting. The date and time of the 3rd meeting is not yet finalized.

Outcome of the meeting

  • Try to do better organization for the next meeting.
  • Encourage Igem-ers to join the Critical Review Design Committee.


http://2006.igem.org/Critical_Design_Review back

Personal tools
Past/present/future years