Third Meeting, Wednesday, August 9, 2006

From 2006.igem.org

(Difference between revisions)
Jump to: navigation, search
Line 4: Line 4:
4 basic endpoints: RFP, GFP, LacI and cI.  Thus, the thermometer will be divided up into 4 basic modules.
4 basic endpoints: RFP, GFP, LacI and cI.  Thus, the thermometer will be divided up into 4 basic modules.
-
<b>Considerations:</b>
+
'''Considerations'''
<ul>
<ul>
     <li>Try to make parts that can be used to build other parts later (ie. Make a part and if test is     
     <li>Try to make parts that can be used to build other parts later (ie. Make a part and if test is     
Line 12: Line 12:
     onto the next one.  On that note, we will probably have to do at least two replicates per part   
     onto the next one.  On that note, we will probably have to do at least two replicates per part   
     (done by two different people) so that we have at least two cracks at each part
     (done by two different people) so that we have at least two cracks at each part
-
     <li>Once a module is completed, there will first be a cursory yes/no test to see if SOME output  
+
     <li>Once a module is completed, there will first be a simple yes/no test to see if SOME output  
     is produced.  If yes, move onto building the second module.  While the second module is being  
     is produced.  If yes, move onto building the second module.  While the second module is being  
     constructed, the first module will be more thoroughly tested for linear range, transcription  
     constructed, the first module will be more thoroughly tested for linear range, transcription  
Line 18: Line 18:
     <li>All functionality of the parts is in context.  One part may work fine in one context but not   
     <li>All functionality of the parts is in context.  One part may work fine in one context but not   
     work in the next
     work in the next
-
 
</ul>
</ul>
 +
 +
== Cell-See-Us Thermometer (2005 Team Design) ==
 +
 +
'''Top Level'''
 +
 +
''[[http://2006.igem.org/Critical_Design_Review back]]''
''[[http://2006.igem.org/Critical_Design_Review back]]''

Revision as of 02:33, 16 August 2006

The Third Critical Design Review meeting took on 9th August, Wednesday at the SF Basement(SUDS).

Overview

4 basic endpoints: RFP, GFP, LacI and cI. Thus, the thermometer will be divided up into 4 basic modules.

Considerations

  • Try to make parts that can be used to build other parts later (ie. Make a part and if test is successful, the part can then be used as is in the next ligation)
  • Parallel Processing is KEY. Need to build as many different parts at the same time in order to use our time efficiently. We do not have time to wait and see if one part works before moving onto the next one. On that note, we will probably have to do at least two replicates per part (done by two different people) so that we have at least two cracks at each part
  • Once a module is completed, there will first be a simple yes/no test to see if SOME output is produced. If yes, move onto building the second module. While the second module is being constructed, the first module will be more thoroughly tested for linear range, transcription rates, etc.
  • All functionality of the parts is in context. One part may work fine in one context but not work in the next

Cell-See-Us Thermometer (2005 Team Design)

Top Level


http://2006.igem.org/Critical_Design_Review back

Personal tools
Past/present/future years