Timeline
From 2006.igem.org
(Difference between revisions)
Line 1: | Line 1: | ||
- | |||
- | |||
==Week 3: 3rd - 7th July== | ==Week 3: 3rd - 7th July== | ||
Revision as of 13:23, 3 July 2006
Week 3: 3rd - 7th July
Objectives for the arsenic sensor:
Assess the effects of the:
1) bacterial population density on Ph
2) growth phase on Ph change
3) concentration of lactose on Ph
4) time on Ph
All effects are to be measured on the Ph of the liquid cultures with the Lacz deficient strain of E-coli.
Objectives for the 3d structure builder:
1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate
Week 2: 26th - 30th June
More Brainstorming
Week 1: 19th - 23rd June
Brainstorming