Timeline
From 2006.igem.org
(Difference between revisions)
(→<font color='red'>Week 2: 26th - 30th June</font>) |
(→<font color='red'>Week 1: 19th - 23rd June</font>) |
||
Line 29: | Line 29: | ||
More Brainstorming | More Brainstorming | ||
- | ==<font color='red'>Week 1: | + | ==<font color='red'>Week 1: 19<sup>th</sup>th - 23<sup>rd</sup>rd June</font>== |
Brainstorming | Brainstorming |
Revision as of 14:07, 3 July 2006
Week 3: 3rdrd - 7th July
Objectives for the arsenic sensor:
Assess the effects of the:
1) bacterial population density on pH
2) growth phase on pH change
3) concentration of lactose on pH
4) time on pH
All effects are to be measured on the pH of the liquid cultures with the Lacz deficient strain of E-coli.
Objectives for the 3d structure builder:
1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate
Week 2: 26thth - 30thth June
More Brainstorming
Week 1: 19thth - 23rdrd June
Brainstorming