==Work Updates==
+
== Current Work: ==
 +
*''Conjugation testing:''<br>
 +
**oriT - Test plasmid mobility<br>
 +
**TraJf, TraJr - does promoter induction cause conjugation to initiate?<br>
 +
**Test mobilization construct<br>
 +
*''Construction:''<br>
 +
**Spo0A - QuikChange (Stratagene kit site directed mutagenesis) out the Eco site and finish mobilizable construct for OriTf
 +
*Lock and Key Strength
 +
**Flourescence assays
 +
*''Other''
 +
**onRFP - Find out cause for onRFP sporadic behaviour during conjugation (tetR presence?)
 +
-
<i><u>November: </i></u>
+
== Milestones: ==
 +
 
 +
<i><u>November:</u></i><br>
Measurement data for constructs, construction continues
Measurement data for constructs, construction continues
-
September: Project training continues, implementation begins<br>
+
<i><u>September:</u></i><br>
 +
Project training continues, implementation begins<br>
-
July-August: Theoretical project design and background research on bacterial conjugation and technique training<br>
+
<i><u>July-August:</u></i><br>
 +
Theoretical project design and background research on bacterial conjugation and technique training<br>
-
May-June: Synthetic Biology primer and project brainstorming <br>
+
<i><u>May-June:</u></i><br>
 +
Synthetic Biology primer and project brainstorming <br>

Latest revision as of 09:03, 14 November 2005

Current Work:

  • Conjugation testing:
    • oriT - Test plasmid mobility
    • TraJf, TraJr - does promoter induction cause conjugation to initiate?
    • Test mobilization construct
  • Construction:
    • Spo0A - QuikChange (Stratagene kit site directed mutagenesis) out the Eco site and finish mobilizable construct for OriTf
  • Lock and Key Strength
    • Flourescence assays
  • Other
    • onRFP - Find out cause for onRFP sporadic behaviour during conjugation (tetR presence?)


Milestones:

November:
Measurement data for constructs, construction continues

September:
Project training continues, implementation begins

July-August:
Theoretical project design and background research on bacterial conjugation and technique training

May-June:
Synthetic Biology primer and project brainstorming