Timeline

From 2006.igem.org

(Difference between revisions)
Jump to: navigation, search
(Week 3 3rd - 7th July. Objectives to be completed by Friday)
Line 23: Line 23:
1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate
1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate
-
==Week 2==
+
==Week 2: 26th - 30th June==
More Brainstorming  
More Brainstorming  
-
==Week 1==
+
==Week 1: 19th - 23rd June==
Brainstorming
Brainstorming

Revision as of 13:18, 3 July 2006

Week 3: 3rd - 7th July

Objectives for the arsenic sensor:


Assess the effects of the:


1) bacterial population density on Ph

2) growth phase on Ph change

3) concentration of lactose on Ph

4) time on Ph

All these effects are to be measured on the Ph of the liquid cultures with the Lacz deficient strain of E-coli.


Objectives for the 3d structure builder:


1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate

Week 2: 26th - 30th June

More Brainstorming

Week 1: 19th - 23rd June

Brainstorming

Personal tools
Past/present/future years