Timeline

From 2006.igem.org

(Difference between revisions)
Jump to: navigation, search
Line 1: Line 1:
==<font color='red'>Week 3:  3rd - 7th July</font>==
==<font color='red'>Week 3:  3rd - 7th July</font>==
-
'''Objectives for the arsenic sensor:'''
+
'''<font color='blue'>Objectives for the arsenic sensor:</font>'''
Line 8: Line 8:
-
1)  bacterial population density on Ph
+
1)  bacterial population density on pH
-
2)  growth phase on Ph change
+
2)  growth phase on pH change
-
3)  concentration of lactose on Ph
+
3)  concentration of lactose on pH
-
4)  time on Ph
+
4)  time on pH
-
All effects are to be measured on the Ph of the liquid cultures with the Lacz deficient strain of E-coli.   
+
All effects are to be measured on the pH of the liquid cultures with the Lacz deficient strain of E-coli.   

Revision as of 13:40, 3 July 2006

Week 3: 3rd - 7th July

Objectives for the arsenic sensor:


Assess the effects of the:


1) bacterial population density on pH

2) growth phase on pH change

3) concentration of lactose on pH

4) time on pH


All effects are to be measured on the pH of the liquid cultures with the Lacz deficient strain of E-coli.


Objectives for the 3d structure builder:


1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate

Week 2: 26th - 30th June

More Brainstorming

Week 1: 19th - 23rd June

Brainstorming

Personal tools
Past/present/future years