Timeline

From 2006.igem.org

(Difference between revisions)
Jump to: navigation, search
(<font color='red'>Week 3: 3rd - 7th July</font>)
(<font color='red'>Week 2: 26th - 30th June</font>)
Line 25: Line 25:
1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate
1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate
-
==<font color='red'>Week 2: 26th - 30th June</font>==
+
==<font color='red'>Week 2: 26<sup>th</sup>th - 30<sup>th</sup>th June</font>==
-
More Brainstorming  
+
More Brainstorming
==<font color='red'>Week 1: 19th - 23rd June</font>==
==<font color='red'>Week 1: 19th - 23rd June</font>==
Brainstorming
Brainstorming

Revision as of 14:07, 3 July 2006

Week 3: 3rdrd - 7th July

Objectives for the arsenic sensor:


Assess the effects of the:


1) bacterial population density on pH

2) growth phase on pH change

3) concentration of lactose on pH

4) time on pH


All effects are to be measured on the pH of the liquid cultures with the Lacz deficient strain of E-coli.


Objectives for the 3d structure builder:


1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate

Week 2: 26thth - 30thth June

More Brainstorming

Week 1: 19th - 23rd June

Brainstorming

Personal tools
Past/present/future years