Week 3: 3rd - 7th July
Objectives for the arsenic sensor:
Assess the effects of the:
- 1) bacterial population density on pH
- 2) growth phase on pH change
- 3) concentration of lactose on pH
- 4) time on pH
All effects are to be measured on the pH of the liquid cultures with the Lacz deficient strain of E-coli.
Objectives for the 3d structure builder:
1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate
Week 2: 26th - 30th June
More Brainstorming
Week 1: 19th - 23rd June
Brainstorming