Timeline
From 2006.igem.org
(Difference between revisions)
(→'''<font color='blue'>Objectives for the arsenic sensor:</font>''') |
|||
Line 16: | Line 16: | ||
- | All effects are to be measured on the pH of the liquid cultures with the Lacz deficient strain of E-coli. | + | All effects are to be measured on the pH of the liquid cultures with the Lacz deficient strain of E-coli. |
+ | Due to problems in the lab, the above objectives are revised to next week. These problems are illustrated in the [http://2006.igem.org/Lab_Work Lab work section]. Objectives for this week are now to get the first PCR primers made to assemble our first biobricks. Tests for the production of lactic acid on L-agar plates using the LacZ plasmids should be started tomorrow afternoon after the lecture from Dr Elfick. | ||
==='''<font color='blue'>Objectives for the 3d structure builder:</font>'''=== | ==='''<font color='blue'>Objectives for the 3d structure builder:</font>'''=== |
Revision as of 15:40, 6 July 2006
Contents |
Week 3: 3rd - 7th July
Objectives for the arsenic sensor:
Assess the effects of the:
- 1) bacterial population density on pH
- 2) growth phase on pH change
- 3) concentration of lactose on pH
- 4) time on pH
All effects are to be measured on the pH of the liquid cultures with the Lacz deficient strain of E-coli.
Due to problems in the lab, the above objectives are revised to next week. These problems are illustrated in the Lab work section. Objectives for this week are now to get the first PCR primers made to assemble our first biobricks. Tests for the production of lactic acid on L-agar plates using the LacZ plasmids should be started tomorrow afternoon after the lecture from Dr Elfick.
Objectives for the 3d structure builder:
1) Determine whether to use the Urease or Phosphatase enzyme to precipitate a solid substrate
Week 2: 26th - 30th June
More Brainstorming
Week 1: 19th - 23rd June
Brainstorming