Tokyo Alliance: Conclusion

From 2006.igem.org

(Difference between revisions)
Jump to: navigation, search
Line 34: Line 34:
***'''B-52''' LacI tandem
***'''B-52''' LacI tandem
****'''B-52-''a1''''' LacI tandem-TetR
****'''B-52-''a1''''' LacI tandem-TetR
 +
*'''C''' pSB LacI prom. #1
*'''C''' pSB LacI prom. #1
 +
*'''D''' pSB TyrS prom.
*'''D''' pSB TyrS prom.
**'''D-1''' TyrS
**'''D-1''' TyrS
 +
*'''E''' natural LacI prom.
*'''E''' natural LacI prom.

Revision as of 11:00, 22 October 2006

Top : Introduction : Significance : Design/Method : Results/Conclusion : About Tokyo Alliance

Construction Family Tree (rev.1022)

We constructed YES gates and AND gates shown above accorinding to our Construction Procedure.

Construction Index

  • A pSB#4 "pSBΔP"
    • A-1 MelR
    • A-2 EmrR
      • A-20-a1 EmrR-FadR
    • A-3 BetI
    • A-4 LuxR
      • A-40-a1 LuxR-FadR
      • A-40-a2 luxR-TetR
      • A-40-a3 LuxR-LacI tandem
    • A-5 AraC
      • A-50-a1 AraC-FadR
      • A-50-a2 AraC-TetR
      • A-50-a3 AraC-LacI tandem


  • B pSB Lacq prom. #4
    • B-1 RbsR
    • B-2 FadR
      • B-21 FadR tandem
    • B-3 TetR
    • B-4 LVA
    • B-5 LacI (Library)
      • B-51 LVA
      • B-52 LacI tandem
        • B-52-a1 LacI tandem-TetR


  • C pSB LacI prom. #1


  • D pSB TyrS prom.
    • D-1 TyrS


  • E natural LacI prom.
Personal tools
Past/present/future years