ETH Zurich 2006

From 2006.igem.org

(Difference between revisions)
Jump to: navigation, search
(News)
Line 1: Line 1:
= News =
= News =
-
* 2005.09.23 Sequences for NOR module ordered from Blue Heron
+
* '''2005.10.07''' Message from Blue Heron: Sequences for NOR are synthesized and will be verified and assembled next week.
 +
* '''2005.09.23''' Sequences for NOR module ordered from Blue Heron
= Organisation =
= Organisation =

Revision as of 08:57, 8 October 2005

Contents

News

  • 2005.10.07 Message from Blue Heron: Sequences for NOR are synthesized and will be verified and assembled next week.
  • 2005.09.23 Sequences for NOR module ordered from Blue Heron

Organisation

People

Students

Simon Barkow Christophe Dessimoz Zlatko Franjcic
Dominic Frutiger Robin Künzler Urs A. Müller
Jonas Nart Kristian Nolde Alexander Roth
Tamara Ulrich Giorgia Valsesia Herve Vanderschuren

Supervisors

Jörg Stelling Sven Panke Eckart Zitzler

Advisors

Uwe Sauer Martin Fussenegger Andreas Hierlemann
Kay-Uwe Kirstein Ruedi Aebersold

Timeline & Tasks

Groups

Modeling

  • Members: Tamara, Kristian, Zlatko

This group is focused on mathematical modeling, illustration, simulations and overall design. There are no permanent members for this group. Anyone can join and leave the group anytime he/she wants. A group coordinator will be assigned at the first meeting.

  • Meetings:
empty

Input Module

  • Members: Christophe, Dominic (coordinator), Giorgia, Herve, Zlatko
  • Meetings:
log 2005-08-17: Wednesday, 13:00 @ polyterrasse: Discussion of module, next steps, task distrib.
log 2005-08-22: Monday, 15:00 @ polyterrasse: Discussion of biol. solutions.
log 2005-09-12: Thursday, 17:30 @ teammeeting.

NOR Module

  • Members: Alex (coordinator), Jonas, Robin, Simon, Tamara, Urs
  • Meetings:
log 2005.08.17, Wednesday, 15:30  
2005.08.18, Thursday, 13:15
log 2005.08.22, Monday, 13:45
2005.08.25, Thursday 15:30
2005.08.29, Monday 14:00
2005.08.30, Tuesday 16:00
2005.09.06, Tuesday 08:00

Documentation: 'todo' list

Introduction

Selected Project: We have voted that the Counter-approach would be the more suitable in the context of iGEM. The Counter-project selected for further development if time allow us possibly merged with one or two modules from the SO-Constructor as output modules.

Modeling

Methods

Input-module

Module description: in a nutshell, this module has 2 system boundaries, both of which are characterized by PoPS. Its purpose is to take a single input PoPS and output 2 different PoPS. One of the outputs should be high and the other low when S is high and vice versa when S is low.

The iGEM-team at ETH decided to implement a modular and standardized Counter-system that can in principle be used to count any kind of biological event and generate any kind of output after a certain number N of events has been detected. The Counter-system can be split into 2 basic units, the NOR-module and the INPUT-module (outlined in red in the schematic below). This document deals with the implementation of the INPUT-module.

Counter Schematic

NOR Module

A NOR-module works as follows: There are two inputs and one output. The output is high if and only if the two inputs are low. In other words: The output is low whenever either one (or both) of the inputs are high.

Counter

Results

Discussion

Appendix

References

Modeling and illustration tools,

bulter04, atkinson03, bates05, keiler01, suetsugu03, sudesh00, römling02, ross91, sutherland01, Lai04, zogaj01, miller01, basu05, goryachev05, you04, Isalan01, Beerli02, Mani05, Beerli00, Beerli98, Dreier01, Dreier05, Klug05, Yang95, Segal99, Segal03,

Glossary

Previous Ideas

This is the brainstorming and previous ideas section. In this section you will find other projects that had been pursued, as well as random ideas without too much consideration of feasibility, etc.

Personal tools
Past/present/future years