Tokyo Alliance: Conclusion
From 2006.igem.org
We constructed YES gates and AND gates shown above accorinding to our Construction Procedure.
Construction Index
- A pSB#4 "pSBΔP"
- A-1 MelR
- A-2 EmrR
- A-20-a1 EmrR-FadR
- A-3 BetI
- A-4 LuxR
- A-40-a1 LuxR-FadR
- A-40-a2 luxR-TetR
- A-40-a3 LuxR-LacI tandem
- A-5 AraC
- A-50-a1 AraC-FadR
- A-50-a2 AraC-TetR
- A-50-a3 AraC-LacI tandem
- B pSB Lacq prom. #4
- B-1 RbsR
- B-2 FadR
- B-21 FadR tandem
- B-3 TetR
- B-4 LVA
- B-5 LacI (Library)
- B-51 LVA
- B-52 LacI tandem
- B-52-a1 LacI tandem-TetR
- C pSB LacI prom. #1
- D pSB TyrS prom.
- D-1 TyrS
- E natural LacI prom.