Tokyo Alliance: Conclusion

From 2006.igem.org

Revision as of 11:05, 22 October 2006 by Shogo (Talk | contribs)
Jump to: navigation, search
Top : Introduction : Significance : Design/Method : Results/Conclusion : About Tokyo Alliance

Construction Family Tree (rev.1022)

We constructed YES gates and AND gates shown above accorinding to our Construction Procedure.

Construction Index

  • A pSB#4 "pSBΔP"
    • A-1 MelR J54111
    • A-2 EmrR J54121
      • A-20-a1 EmrR-FadR
    • A-3 BetI J54131
    • A-4 LuxR J54140
      • A-40-a1 LuxR-FadR J54141
      • A-40-a2 luxR-TetR J54142
      • A-40-a3 LuxR-LacI tandem J54143
    • A-5 AraC J54150
      • A-50-a1 AraC-FadR J54152
      • A-50-a2 AraC-TetR J54153
      • A-50-a3 AraC-LacI tandem J54154


  • B pSB Lacq prom. #4 J54202
    • B-1 RbsR J54212
    • B-2 FadR J54222
      • B-21 FadR tandem
    • B-3 TetR J54232
    • B-4 LVA
    • B-5 LacI (Library) J54251
      • B-51 LVA
      • B-52 LacI tandem J54252
        • B-52-a1 LacI tandem-TetR


  • C pSB LacI prom. #1


  • D pSB TyrS prom.
    • D-1 TyrS


  • E natural LacI prom.
Personal tools
Past/present/future years